- Planning compliance compares the building with the permits held by the municipality. Cadastral compliance compares it with the plan held by the land registry. They are different things.
- The cadastral plan is a tax record. It does not prove that anything was built legally.
- Unauthorised works follow the property, not the person who built them. The current owner answers for them.
- The 2024 "Salva Casa" reform widened tolerances and simplified some regularisations. It is not an amnesty.
What is the difference between planning and cadastral compliance?
Planning and building compliance asks whether the house as it stands corresponds to what the municipality authorised over the years: the original permit and every later one. The result is called the stato legittimo, the lawful state of the building, defined by article 9-bis of the Italian building code (DPR 380/2001).
Cadastral compliance asks whether the plan and data filed with the land registry (Catasto) correspond to the property as it is. The Catasto exists for tax purposes. A cadastral plan that shows a room does not mean the room was ever permitted.
A property can pass one check and fail the other. Buyers who are told "the plan matches" have usually been told about the cadastre only.
What does the notary actually check?
The deed of sale must contain a declaration that the cadastral data and plan match the actual state of the property, or a technician's attestation to that effect. Without it the deed is void (article 29, paragraph 1-bis, law 52/1985). The deed must also cite the building permits, or state that construction began before 1 September 1967.
These are statements written into the deed. The notary records them and checks the title, mortgages and registered charges. The notary does not measure the house or compare it with the municipal file. Italy's highest court has confirmed that a deed which cites a real permit is valid even if the building differs from it. The sale stands, and so does the irregularity.
What are the most common discrepancies?
- Internal walls moved, rooms merged or divided without a filing.
- A loggia, balcony or veranda closed in and turned into a room.
- An attic, cellar or garage used as living space.
- An extra bathroom or kitchen, new windows or doors in the facade.
- Extensions, outbuildings, pergolas with fixed roofs, swimming pools.
- A footprint or height slightly different from the approved drawings.
Why does it matter if the sale is valid anyway?
Because the consequences fall on the owner. The municipality can order unauthorised works to be removed, whoever built them. You cannot obtain a permit for your own renovation until the existing state is lawful. Banks and future buyers ask for the same check you skipped. Some discrepancies can be regularised by paying a fee; others, especially added volume in protected areas, cannot.
What changed with the 2024 Salva Casa reform?
Decree-law 69/2024, converted into law 105/2024, amended the building code. For works carried out before 24 May 2024 it widened the construction tolerances from 2% up to 6% of the approved measurements, depending on the size of the unit. It made the lawful state easier to prove, starting from the most recent permit when the municipality has already verified the earlier ones, and it eased the regularisation of some partial discrepancies. It did not legalise extensions and added volumes, and regions apply it in different ways. A discrepancy that "Salva Casa fixes" still has to be checked case by case.
How is the check done, and when?
We request the building file from the municipal archive (accesso agli atti), which can take weeks, obtain the cadastral plan and records, and compare both with the house as measured on site. The outcome is one of three: compliant; not compliant but regularisable, with a cost and a timescale; or not regularisable. The check belongs before the preliminary contract. If it has to come later, the contract should oblige the seller to deliver the property in a lawful state, attested by a technician, before completion.